To relocate the Q4 residential platform, the Reshadat project was required to provide the weight of the structure to the engineering team, after which the platform was placed on the ransom for relocation. Installing lifting trunnions of the platform and then performing sea fastening operations on the barge of this platform was the responsibility of Farashaha Lian Innovators Company, which was completed without any accident.