1. Home
  2. Projects
  3. Installation of phase 14B and 14D tripods

Installation of phase 14B and 14D tripods

No Comments

SPD14B tripod weighing 505 tons and 78 meters high, after loading on 105 Tondgovian barge, from the yard of Mobin Sazeh Gostar Persian Gulf Company located in Bandar Abbas, headed to the South Pars region located in the Persian Gulf Sea. After reaching this tripod in the desired position, the 78-meter structure was successfully installed by SEAPAD crane floating on October 26, 2016, and after that it was finished with piling and grouting operations. The SPD14D tripod, weighing 522 tons and 83 meters high, also loaded on the 105 Tondgovian barge, from the yard of Mobin Sazeh Gostar Persian Gulf Company located in Bandar Abbas, to the South Pars region located in the Persian Gulf Sea. After reaching this tripod in the desired position, the 83-meter structure was successfully installed by SEAPAD crane floating on June 29, 2017, and then ended with piling and grouting operations. These projects were carried out in compliance with all safety points and without accidents. It is an honor for this company to rely on the Iranian ability and knowledge to complete all stages from the beginning to the end of this project, including calculations and preparation of plans for the engineering sector, supply of labor and expertise and Iranian companies for the executive sector.

نوشته قبلی
Hook Up operation and pre-commissioning of SPD 14D & C;
نوشته بعدی
Installation of phase 14C and 14A tripods

Leave a Reply

Your email address will not be published. Required fields are marked *

Fill out this field
Fill out this field
Please enter a valid email address.
You need to agree with the terms to proceed

Menu