1. خانه
  2. Projects
  3. Installing SPD14B platform

Installing SPD14B platform

بدون دیدگاه

SPD14B platform weighing 2273 tons, after loading on 105 Tondgovian barge, from the yard of Mobin Sazeh Gostar Persian Gulf Company located in Bandar Abbas, headed to the South Pars region located in the Persian Gulf Sea. After the arrival of this platform in the desired position, the 2273 ton platform with its accessories was successfully installed by the HL5000 crane float on July 13, 2017. This project was carried out by observing all safety points and without accidents. It is an honor for this company to rely on the Iranian ability and knowledge to complete all stages from the beginning to the end of this project, including calculations and preparation of plans for the engineering sector, supply of labor and expertise and Iranian companies for the executive sector.

نوشته قبلی
Installing SPD14C platform
نوشته بعدی
SPD 18-B Platform Installation

دیدگاهتان را بنویسید

نشانی ایمیل شما منتشر نخواهد شد.

این فیلد را پر کنید
این فیلد را پر کنید
لطفاً یک نشانی ایمیل معتبر بنویسید.
برای ادامه، شما باید با قوانین موافقت کنید

فهرست