Installing SPD14C platform

بدون دیدگاه

SPD14C platform weighing 2071 tons, after loading on 105 Tondgovian barge, from the yard of Mobin Sazeh Gostar Persian Gulf Company located in Bandar Abbas, headed to the South Pars region located in the Persian Gulf Sea. After reaching this platform in the desired position, the 2071 ton platform with its accessories was successfully installed by the HL5000 crane float on January 25, 2017. This project was carried out by observing all safety points and without accidents. It is an honor for this company to rely on the Iranian ability and knowledge to complete all stages from the beginning to the end of this project, including calculations and preparation of plans for the engineering sector, supply of labor and expertise and Iranian companies for the executive sector.

نوشته قبلی
Installation of phase 14C and 14A tripods
نوشته بعدی
Installing SPD14B platform

دیدگاهتان را بنویسید

نشانی ایمیل شما منتشر نخواهد شد.

این فیلد را پر کنید
این فیلد را پر کنید
لطفاً یک نشانی ایمیل معتبر بنویسید.
برای ادامه، شما باید با قوانین موافقت کنید

فهرست